Stopping the Tas

By kind permission of the Environment Agency, we chose to demonstrate the versatility and effectiveness of the Aqua Levee flood control system by stopping the River Tas.

Trailer with Aqua Levee packs

Accessing the site was simple. Aqua Levee packs flat for easy transportation and storage. Up to 160 metres of barrier can be towed on a trailer.

Deployed barrier

In less than fifteen minutes two men, operating a 50mm pump to fill the units, were able to stem the flow of the river. In that time, the riverbed was dried, enabling inspection or work, or representing the enormous savings from potential damage to businesses and communities had the river been a flood.

Dry riverbedFast flowing water

The pool upstream rose fourteen inches while the barriers were in place, enabling us to simulate much faster flowing water by removing a barrier. Another unit was simply inserted into the gap, filled, and the effective temporary barrier reinstated, demonstrating the real-world abilities of the Aqua Levee system.

Barrier

Once our tests were completed, the units were simply removed, drained and packed on the trailer, ready for another deployment.

Barrier

CD videos of this deployment, and others in the USA, are available. Please call Finlay Hunter on 01379 644033.